Skip to main content

Để giao dịch tại Mỹ, hãy truy cập polymarket.us

icon for How many Chinook will pass Bonneville Dam by October 31?

How many Chinook will pass Bonneville Dam by October 31?

icon for How many Chinook will pass Bonneville Dam by October 31?

How many Chinook will pass Bonneville Dam by October 31?

MỚI
Oct 31, 2026
Polymarket

$2,761 KL.

Polymarket

More than 550,000

$1,242 KL.

88%

More than 575,000

$455 KL.

83%

More than 600,000

$1,063 KL.

67%

This market will resolve to "Yes" if "Chinook" Adult Passage Annual Count at Bonneville Dam from January 1, 2026 through October 31, 2026, 11:59 PM ET, exceeds the listed value. Otherwise, this market will resolve to "No". Each market in this event will resolve independently, and any number of these markets, including all or none, may resolve to "Yes". The qualifying data is the Adult Passage Annual Count for Bonneville Dam for the date range January 1, 2026 through October 31, 2026, 11:59 PM ET. Jack Chinook will not be considered for resolution. A value exactly equal to the listed value will resolve to "No". The value read for that date range is final, and counts for dates after October 31, 2026 are disregarded. The count is used as published, without expansion, interpolation, or adjustment, and annual and year-to-date summary totals are not used. The resolution date is November 3, 2026, 11:59 PM ET, extending to November 17, 2026, 11:59 PM ET if the count through October 31, 2026 has not been published by that time. If DART has not published the count through October 31, 2026 by November 17, 2026, 11:59 PM ET, this market will resolve based on the available data. If Columbia River DART becomes unavailable and does not re-appear by November 17, 2026, 11:59 PM ET, all markets will resolve to "No". No substitute data provider will be used. Revisions published before the controlling deadline are incorporated; revisions published after the controlling deadline are disregarded. The primary resolution source for this market will be the Columbia River DART Adult Passage Annual Count for Chinook at Bonneville Dam, available here: https://www.cbr.washington.edu/dart/cs/php/rpt/adult_annual.php?outputFormat=html&proj=BON&startdate=1/1&enddate=10/31Recent adult Chinook passage at Bonneville Dam through late August 2026 totals near 348,000 fish since August 1, tracking close to the five-year average and slightly above 2025 levels according to U.S. Army Corps of Engineers data. Fall-run components, which dominate late-season counts through October 31, depend on Columbia River flows, water temperatures typically 15–20 °C that influence migration timing and energy reserves, and ocean productivity indices affecting adult returns. Preseason forecasts from regional technical committees project roughly 637,000 total adult fall Chinook for 2026, with daily visual and video counts plus DART inseason models providing updates that can shift trader-implied probabilities. Key upcoming releases include weekly USACE passage summaries and any revised hydrographic or temperature outlooks from NOAA that may alter remaining run timing.

This market will resolve to "Yes" if "Chinook" Adult Passage Annual Count at Bonneville Dam from January 1, 2026 through October 31, 2026, 11:59 PM ET, exceeds the listed value. Otherwise, this market will resolve to "No". Each market in this event will resolve independently, and any number of these markets, including all or none, may resolve to "Yes".

The qualifying data is the Adult Passage Annual Count for Bonneville Dam for the date range January 1, 2026 through October 31, 2026, 11:59 PM ET. Jack Chinook will not be considered for resolution. A value exactly equal to the listed value will resolve to "No". The value read for that date range is final, and counts for dates after October 31, 2026 are disregarded. The count is used as published, without expansion, interpolation, or adjustment, and annual and year-to-date summary totals are not used.

The resolution date is November 3, 2026, 11:59 PM ET, extending to November 17, 2026, 11:59 PM ET if the count through October 31, 2026 has not been published by that time. If DART has not published the count through October 31, 2026 by November 17, 2026, 11:59 PM ET, this market will resolve based on the available data. If Columbia River DART becomes unavailable and does not re-appear by November 17, 2026, 11:59 PM ET, all markets will resolve to "No". No substitute data provider will be used. Revisions published before the controlling deadline are incorporated; revisions published after the controlling deadline are disregarded.

The primary resolution source for this market will be the Columbia River DART Adult Passage Annual Count for Chinook at Bonneville Dam, available here: https://www.cbr.washington.edu/dart/cs/php/rpt/adult_annual.php?outputFormat=html&proj=BON&startdate=1/1&enddate=10/31
This market will resolve to "Yes" if "Chinook" Adult Passage Annual Count at Bonneville Dam from January 1, 2026 through October 31, 2026, 11:59 PM ET, exceeds the listed value. Otherwise, this market will resolve to "No". Each market in this event will resolve independently, and any number of these markets, including all or none, may resolve to "Yes". The qualifying data is the Adult Passage Annual Count for Bonneville Dam for the date range January 1, 2026 through October 31, 2026, 11:59 PM ET. Jack Chinook will not be considered for resolution. A value exactly equal to the listed value will resolve to "No". The value read for that date range is final, and counts for dates after October 31, 2026 are disregarded. The count is used as published, without expansion, interpolation, or adjustment, and annual and year-to-date summary totals are not used. The resolution date is November 3, 2026, 11:59 PM ET, extending to November 17, 2026, 11:59 PM ET if the count through October 31, 2026 has not been published by that time. If DART has not published the count through October 31, 2026 by November 17, 2026, 11:59 PM ET, this market will resolve based on the available data. If Columbia River DART becomes unavailable and does not re-appear by November 17, 2026, 11:59 PM ET, all markets will resolve to "No". No substitute data provider will be used. Revisions published before the controlling deadline are incorporated; revisions published after the controlling deadline are disregarded. The primary resolution source for this market will be the Columbia River DART Adult Passage Annual Count for Chinook at Bonneville Dam, available here: https://www.cbr.washington.edu/dart/cs/php/rpt/adult_annual.php?outputFormat=html&proj=BON&startdate=1/1&enddate=10/31
Khối lượng
$2,761
Ngày kết thúc
Nov 4, 2026
Thị trường mở
Sep 15, 2026, 5:12 PM ET
This market will resolve to "Yes" if "Chinook" Adult Passage Annual Count at Bonneville Dam from January 1, 2026 through October 31, 2026, 11:59 PM ET, exceeds the listed value. Otherwise, this market will resolve to "No". Each market in this event will resolve independently, and any number of these markets, including all or none, may resolve to "Yes". The qualifying data is the Adult Passage Annual Count for Bonneville Dam for the date range January 1, 2026 through October 31, 2026, 11:59 PM ET. Jack Chinook will not be considered for resolution. A value exactly equal to the listed value will resolve to "No". The value read for that date range is final, and counts for dates after October 31, 2026 are disregarded. The count is used as published, without expansion, interpolation, or adjustment, and annual and year-to-date summary totals are not used. The resolution date is November 3, 2026, 11:59 PM ET, extending to November 17, 2026, 11:59 PM ET if the count through October 31, 2026 has not been published by that time. If DART has not published the count through October 31, 2026 by November 17, 2026, 11:59 PM ET, this market will resolve based on the available data. If Columbia River DART becomes unavailable and does not re-appear by November 17, 2026, 11:59 PM ET, all markets will resolve to "No". No substitute data provider will be used. Revisions published before the controlling deadline are incorporated; revisions published after the controlling deadline are disregarded. The primary resolution source for this market will be the Columbia River DART Adult Passage Annual Count for Chinook at Bonneville Dam, available here: https://www.cbr.washington.edu/dart/cs/php/rpt/adult_annual.php?outputFormat=html&proj=BON&startdate=1/1&enddate=10/31Recent adult Chinook passage at Bonneville Dam through late August 2026 totals near 348,000 fish since August 1, tracking close to the five-year average and slightly above 2025 levels according to U.S. Army Corps of Engineers data. Fall-run components, which dominate late-season counts through October 31, depend on Columbia River flows, water temperatures typically 15–20 °C that influence migration timing and energy reserves, and ocean productivity indices affecting adult returns. Preseason forecasts from regional technical committees project roughly 637,000 total adult fall Chinook for 2026, with daily visual and video counts plus DART inseason models providing updates that can shift trader-implied probabilities. Key upcoming releases include weekly USACE passage summaries and any revised hydrographic or temperature outlooks from NOAA that may alter remaining run timing.

This market will resolve to "Yes" if "Chinook" Adult Passage Annual Count at Bonneville Dam from January 1, 2026 through October 31, 2026, 11:59 PM ET, exceeds the listed value. Otherwise, this market will resolve to "No". Each market in this event will resolve independently, and any number of these markets, including all or none, may resolve to "Yes".

The qualifying data is the Adult Passage Annual Count for Bonneville Dam for the date range January 1, 2026 through October 31, 2026, 11:59 PM ET. Jack Chinook will not be considered for resolution. A value exactly equal to the listed value will resolve to "No". The value read for that date range is final, and counts for dates after October 31, 2026 are disregarded. The count is used as published, without expansion, interpolation, or adjustment, and annual and year-to-date summary totals are not used.

The resolution date is November 3, 2026, 11:59 PM ET, extending to November 17, 2026, 11:59 PM ET if the count through October 31, 2026 has not been published by that time. If DART has not published the count through October 31, 2026 by November 17, 2026, 11:59 PM ET, this market will resolve based on the available data. If Columbia River DART becomes unavailable and does not re-appear by November 17, 2026, 11:59 PM ET, all markets will resolve to "No". No substitute data provider will be used. Revisions published before the controlling deadline are incorporated; revisions published after the controlling deadline are disregarded.

The primary resolution source for this market will be the Columbia River DART Adult Passage Annual Count for Chinook at Bonneville Dam, available here: https://www.cbr.washington.edu/dart/cs/php/rpt/adult_annual.php?outputFormat=html&proj=BON&startdate=1/1&enddate=10/31
This market will resolve to "Yes" if "Chinook" Adult Passage Annual Count at Bonneville Dam from January 1, 2026 through October 31, 2026, 11:59 PM ET, exceeds the listed value. Otherwise, this market will resolve to "No". Each market in this event will resolve independently, and any number of these markets, including all or none, may resolve to "Yes". The qualifying data is the Adult Passage Annual Count for Bonneville Dam for the date range January 1, 2026 through October 31, 2026, 11:59 PM ET. Jack Chinook will not be considered for resolution. A value exactly equal to the listed value will resolve to "No". The value read for that date range is final, and counts for dates after October 31, 2026 are disregarded. The count is used as published, without expansion, interpolation, or adjustment, and annual and year-to-date summary totals are not used. The resolution date is November 3, 2026, 11:59 PM ET, extending to November 17, 2026, 11:59 PM ET if the count through October 31, 2026 has not been published by that time. If DART has not published the count through October 31, 2026 by November 17, 2026, 11:59 PM ET, this market will resolve based on the available data. If Columbia River DART becomes unavailable and does not re-appear by November 17, 2026, 11:59 PM ET, all markets will resolve to "No". No substitute data provider will be used. Revisions published before the controlling deadline are incorporated; revisions published after the controlling deadline are disregarded. The primary resolution source for this market will be the Columbia River DART Adult Passage Annual Count for Chinook at Bonneville Dam, available here: https://www.cbr.washington.edu/dart/cs/php/rpt/adult_annual.php?outputFormat=html&proj=BON&startdate=1/1&enddate=10/31
Khối lượng
$2,761
Ngày kết thúc
Nov 4, 2026
Thị trường mở
Sep 15, 2026, 5:12 PM ET

Cẩn thận với liên kết bên ngoài.

Câu hỏi thường gặp

"How many Chinook will pass Bonneville Dam by October 31?" là thị trường dự đoán trên Polymarket với 3 kết quả có thể nơi các nhà giao dịch mua và bán cổ phần dựa trên điều họ tin sẽ xảy ra. Kết quả dẫn đầu hiện tại là "More than 550,000" ở mức 88%, tiếp theo là "More than 575,000" ở mức 83%. Giá phản ánh xác suất cộng đồng theo thời gian thực. Ví dụ, cổ phần ở giá 88¢ ngụ ý thị trường tập thể cho rằng có 88% khả năng cho kết quả đó. Tỷ lệ này thay đổi liên tục khi trader phản ứng với diễn biến và thông tin mới. Cổ phần đúng kết quả có thể đổi lấy $1 mỗi cổ phần khi thị trường được giải quyết.

"How many Chinook will pass Bonneville Dam by October 31?" là thị trường mới được tạo trên Polymarket, mở vào Sep 15, 2026. Là thị trường sớm, đây là cơ hội để bạn trở thành một trong những trader đầu tiên đặt tỷ lệ và thiết lập tín hiệu giá ban đầu. Bạn cũng có thể đánh dấu trang này để theo dõi khối lượng và hoạt động giao dịch khi thị trường phát triển.

Để giao dịch trên "How many Chinook will pass Bonneville Dam by October 31?," duyệt 3 kết quả có sẵn trên trang này. Mỗi kết quả hiển thị giá hiện tại đại diện cho xác suất ngụ ý của thị trường. Để mở vị thế, chọn kết quả bạn tin là có khả năng nhất, chọn "Có" để giao dịch ủng hộ hoặc "Không" để giao dịch chống, nhập số tiền và nhấn "Giao dịch." Nếu kết quả bạn chọn đúng khi thị trường giải quyết, cổ phần "Có" của bạn trả $1 mỗi cổ phần. Nếu sai, chúng trả $0. Bạn cũng có thể bán cổ phần bất cứ lúc nào trước khi giải quyết nếu muốn chốt lời hoặc cắt lỗ.

Ứng viên dẫn đầu hiện tại cho "How many Chinook will pass Bonneville Dam by October 31?" là "More than 550,000" ở mức 88%, nghĩa là thị trường cho 88% khả năng cho kết quả đó. Kết quả gần nhất tiếp theo là "More than 575,000" ở mức 83%. Tỷ lệ cập nhật theo thời gian thực khi trader mua và bán cổ phần, phản ánh cái nhìn tập thể mới nhất về điều có khả năng xảy ra nhất. Kiểm tra thường xuyên hoặc đánh dấu trang này để theo dõi tỷ lệ thay đổi khi thông tin mới xuất hiện.

Quy tắc giải quyết cho "How many Chinook will pass Bonneville Dam by October 31?" định nghĩa chính xác điều gì cần xảy ra để mỗi kết quả được tuyên bố thắng — bao gồm nguồn dữ liệu chính thức được sử dụng để xác định kết quả. Bạn có thể xem tiêu chí giải quyết đầy đủ trong phần "Quy tắc" trên trang này phía trên bình luận. Chúng tôi khuyên đọc kỹ quy tắc trước khi giao dịch, vì chúng chỉ rõ điều kiện, trường hợp ngoại lệ và nguồn chính xác quản lý cách thị trường được thanh toán.