H100 rental rates have declined sharply through 2026 as Blackwell B200 and B300 supply ramps, shifting frontier workloads and pushing the prior-generation Hopper chip into mid-tier pricing. Marketplace and neocloud on-demand rates now cluster around $1.99–$3.62 per GPU-hour, with spot or interruptible capacity as low as $0.94, while hyperscalers still command $6–11; the premium has roughly halved from 2025 levels. Sustained AI training and inference demand keeps committed contracts firmer than volatile spot markets, but expanded capacity from providers like Voltage Park, RunPod, and Vast.ai, plus hyperscaler price cuts, has compressed H100 economics. Traders are watching Blackwell production volumes, hyperscaler capex execution, and any H200 or next-gen supply signals that could further reprice the installed H100 fleet before year-end.
基于Polymarket数据的AI实验性摘要。这不是交易建议,也不影响该市场的结算方式。 · 更新于↑ $3.50
64%
↓ $2.25
51%
↓ $2.00
36%
↓ $1.50
27%
$9,452 交易量
↑ $3.50
64%
↓ $2.25
51%
↓ $2.00
36%
↓ $1.50
27%
The resolution source for this market is Ornnai.com (ornnai.com), specifically, the H100 Index chart data available at https://dashboard.ornnai.com. The daily values shown on the chart will be used for resolution. Daily data will be considered finalized once the following day’s data point is published.
This market will resolve as soon as the listed price is hit, or once the value for the specified end date is finalized. If not all relevant data has been finalized by the end of the 14th calendar date afterward (ET), this market will resolve based on the data available at that time.
Revisions made to previously published data points, before all relevant data points have been finalized, will be considered; however, they will not disqualify a previously published data point from resolving this market. Revisions made after all relevant data points have been finalized will not be considered.
市场开放时间: Jul 10, 2026, 10:21 AM ET
The resolution source for this market is Ornnai.com (ornnai.com), specifically, the H100 Index chart data available at https://dashboard.ornnai.com. The daily values shown on the chart will be used for resolution. Daily data will be considered finalized once the following day’s data point is published.
This market will resolve as soon as the listed price is hit, or once the value for the specified end date is finalized. If not all relevant data has been finalized by the end of the 14th calendar date afterward (ET), this market will resolve based on the data available at that time.
Revisions made to previously published data points, before all relevant data points have been finalized, will be considered; however, they will not disqualify a previously published data point from resolving this market. Revisions made after all relevant data points have been finalized will not be considered.
H100 rental rates have declined sharply through 2026 as Blackwell B200 and B300 supply ramps, shifting frontier workloads and pushing the prior-generation Hopper chip into mid-tier pricing. Marketplace and neocloud on-demand rates now cluster around $1.99–$3.62 per GPU-hour, with spot or interruptible capacity as low as $0.94, while hyperscalers still command $6–11; the premium has roughly halved from 2025 levels. Sustained AI training and inference demand keeps committed contracts firmer than volatile spot markets, but expanded capacity from providers like Voltage Park, RunPod, and Vast.ai, plus hyperscaler price cuts, has compressed H100 economics. Traders are watching Blackwell production volumes, hyperscaler capex execution, and any H200 or next-gen supply signals that could further reprice the installed H100 fleet before year-end.
基于Polymarket数据的AI实验性摘要。这不是交易建议,也不影响该市场的结算方式。 · 更新于

警惕外部链接哦。
警惕外部链接哦。
常见问题