Skip to main content
icon for Будет ли аварийная ситуация в энергосистеме до 1 октября?

Будет ли аварийная ситуация в энергосистеме до 1 октября?

icon for Будет ли аварийная ситуация в энергосистеме до 1 октября?

Будет ли аварийная ситуация в энергосистеме до 1 октября?

НОВОЕ
1 окт. 2026 г.
Polymarket

$320 Объем

Polymarket

Калифорния (CAISO)

$40 Объем

41%

Техас (ERCOT)

$20 Объем

44%

Центральная часть США (SPP)

$40 Объем

43%

Средний Запад (MISO)

$40 Объем

42%

Средне-Атлантический регион (PJM)

$40 Объем

41%

Нью-Йорк (NYISO)

$140 Объем

26%

Новая Англия (ISO-NE)

$0 Объем

41%

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".Recent extreme heat events have driven multiple U.S. Department of Energy emergency orders, including for PJM in early July and Southwest Power Pool across 17 states through early August 2026, as record demand from air conditioning collided with generation and transmission constraints. NERC’s 2026 Summer Reliability Assessment highlights elevated risks in regions such as New England and the Northwest under above-normal temperatures, even with record resource additions including solar and battery storage, while noting rising net internal demand and cooling degree days several percent above recent averages. EIA data project continued high electricity loads through September, with potential for late-season heat domes or maintenance outages to trigger further Energy Emergency Alerts before October 1. Traders should monitor NERC updates and regional operator forecasts for any renewed stress on reserve margins.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
Объем
$320
Дата окончания
1 окт. 2026 г.
Открытие рынка
Aug 12, 2026, 5:25 PM ET
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".Recent extreme heat events have driven multiple U.S. Department of Energy emergency orders, including for PJM in early July and Southwest Power Pool across 17 states through early August 2026, as record demand from air conditioning collided with generation and transmission constraints. NERC’s 2026 Summer Reliability Assessment highlights elevated risks in regions such as New England and the Northwest under above-normal temperatures, even with record resource additions including solar and battery storage, while noting rising net internal demand and cooling degree days several percent above recent averages. EIA data project continued high electricity loads through September, with potential for late-season heat domes or maintenance outages to trigger further Energy Emergency Alerts before October 1. Traders should monitor NERC updates and regional operator forecasts for any renewed stress on reserve margins.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
Объем
$320
Дата окончания
1 окт. 2026 г.
Открытие рынка
Aug 12, 2026, 5:25 PM ET
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".

Не доверяй внешним ссылкам.

Часто задаваемые вопросы

«Будет ли аварийная ситуация в энергосистеме до 1 октября?» — это рынок прогнозов на Polymarket с 7 возможными исходами, где трейдеры покупают и продают акции на основе своих прогнозов. Текущий лидирующий исход — «Техас (ERCOT)» с 45%, за ним следует «Центральная часть США (SPP)» с 43%. Цены отражают вероятности сообщества в реальном времени. Например, акция по цене 45¢ означает, что рынок коллективно оценивает вероятность этого исхода в 45%. Эти коэффициенты постоянно меняются. Акции правильного исхода можно обменять на $1 каждую при разрешении рынка.

«Будет ли аварийная ситуация в энергосистеме до 1 октября?» — недавно созданный рынок на Polymarket, запущен Aug 12, 2026. Как ранний рынок, это твоя возможность быть среди первых трейдеров, устанавливающих коэффициенты и формирующих начальные ценовые сигналы. Ты также можешь добавить эту страницу в закладки, чтобы следить за объёмом и активностью торгов.

Чтобы торговать на «Будет ли аварийная ситуация в энергосистеме до 1 октября?», просмотри 7 доступных исходов на этой странице. Каждый исход показывает текущую цену, представляющую подразумеваемую вероятность рынка. Чтобы занять позицию, выбери исход, который считаешь наиболее вероятным, выбери «Да» для торговли в его пользу или «Нет» для торговли против, введи сумму и нажми «Торговать». Если твой выбранный исход окажется верным, твои акции «Да» принесут $1 каждая. Если нет — $0. Ты также можешь продать акции до разрешения.

Текущий фаворит для «Будет ли аварийная ситуация в энергосистеме до 1 октября?» — «Техас (ERCOT)» с 45%, что означает, что рынок оценивает вероятность этого исхода в 45%. Следующий ближайший исход — «Центральная часть США (SPP)» с 43%. Эти коэффициенты обновляются в реальном времени по мере покупки и продажи акций. Заходи чаще или добавь страницу в закладки.

Правила разрешения «Будет ли аварийная ситуация в энергосистеме до 1 октября?» точно определяют, что должно произойти, чтобы каждый исход был объявлен победителем, включая официальные источники данных, используемые для определения результата. Ты можешь просмотреть полные критерии разрешения в разделе «Правила» на этой странице над комментариями. Мы рекомендуем внимательно прочитать правила перед торговлей, так как они определяют точные условия, особые случаи и источники.