Skip to main content
icon for Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?

Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?

icon for Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?

Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?

NUOVO
1 ott 2026
Polymarket

$200 Vol.

Polymarket

California (CAISO)

$40 Vol.

41%

Texas (ERCOT)

$0 Vol.

44%

Centro degli Stati Uniti (SPP)

$40 Vol.

43%

Midwest (MISO)

$40 Vol.

41%

Mid-Atlantic (PJM)

$40 Vol.

41%

New York (NYISO)

$40 Vol.

42%

Nuova Inghilterra (ISO-NE)

$0 Vol.

43%

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".Recent extreme heat waves have driven record electricity demand across major U.S. grids, prompting multiple Department of Energy emergency orders in July 2026 for PJM Interconnection and the Southwest Power Pool to maximize generation and avert shortages. These measures addressed peak loads nearing or exceeding prior records amid high air-conditioning use and added strain from data centers, with operators like California ISO continuing to monitor Western heat into early August. Authoritative assessments from NERC highlight adequate resources under normal conditions but note elevated risks in certain regions during prolonged high temperatures or transmission constraints. NOAA forecasts and grid operator updates through September will provide key data on heat persistence before October 1, directly influencing the likelihood of formal Energy Emergency Alerts or rolling outages.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
Volume
$200
Data di fine
1 ott 2026
Mercato aperto
Aug 12, 2026, 5:25 PM ET
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".Recent extreme heat waves have driven record electricity demand across major U.S. grids, prompting multiple Department of Energy emergency orders in July 2026 for PJM Interconnection and the Southwest Power Pool to maximize generation and avert shortages. These measures addressed peak loads nearing or exceeding prior records amid high air-conditioning use and added strain from data centers, with operators like California ISO continuing to monitor Western heat into early August. Authoritative assessments from NERC highlight adequate resources under normal conditions but note elevated risks in certain regions during prolonged high temperatures or transmission constraints. NOAA forecasts and grid operator updates through September will provide key data on heat persistence before October 1, directly influencing the likelihood of formal Energy Emergency Alerts or rolling outages.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
Volume
$200
Data di fine
1 ott 2026
Mercato aperto
Aug 12, 2026, 5:25 PM ET
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".

Fai attenzione ai link esterni.

Domande frequenti

"Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?" è un mercato predittivo su Polymarket con 7 possibili esiti dove i trader comprano e vendono azioni in base a ciò che credono accadrà. L'esito attualmente in testa è "Texas (ERCOT)" a 44%, seguito da "Centro degli Stati Uniti (SPP)" a 43%. I prezzi riflettono probabilità aggregate in tempo reale. Ad esempio, un'azione quotata a 44¢ implica che il mercato assegna collettivamente una probabilità di 44% a quell'esito. Queste quote cambiano continuamente man mano che i trader reagiscono a nuovi sviluppi e informazioni. Le azioni nell'esito corretto possono essere riscattate per $1 ciascuna alla risoluzione del mercato.

"Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?" è un mercato appena creato su Polymarket, lanciato il Aug 12, 2026. Come mercato nuovo, questa è la tua opportunità di essere tra i primi trader a stabilire le quote e i segnali di prezzo iniziali del mercato. Puoi anche aggiungere questa pagina ai preferiti per monitorare il volume e l'attività di trading man mano che il mercato guadagna visibilità.

Per fare trading su "Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?", esplora i 7 esiti disponibili elencati in questa pagina. Ogni esito mostra un prezzo corrente che rappresenta la probabilità implicita del mercato. Per prendere una posizione, seleziona l'esito che ritieni più probabile, scegli "Sì" per fare trading a suo favore o "No" per fare trading contro di esso, inserisci il tuo importo e clicca "Trading". Se il tuo esito scelto è corretto alla risoluzione del mercato, le tue azioni "Sì" pagano $1 ciascuna. Se è errato, pagano $0. Puoi anche vendere le tue azioni in qualsiasi momento prima della risoluzione se vuoi consolidare un profitto o limitare una perdita.

L'attuale favorito per "Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?" è "Texas (ERCOT)" a 44%, il che significa che il mercato assegna una probabilità di 44% a quell'esito. L'esito successivo più vicino è "Centro degli Stati Uniti (SPP)" a 43%. Queste quote si aggiornano in tempo reale man mano che i trader comprano e vendono azioni, quindi riflettono l'ultima visione collettiva di ciò che è più probabile che accada. Controlla frequentemente o aggiungi questa pagina ai preferiti per seguire come cambiano le quote man mano che emergono nuove informazioni.

Le regole di risoluzione per "Ci sarà un'emergenza della rete elettrica prima del 1° ottobre?" definiscono esattamente cosa deve accadere affinché ogni esito venga dichiarato vincitore — comprese le fonti di dati ufficiali utilizzate per determinare il risultato. Puoi consultare i criteri completi di risoluzione nella sezione "Regole" di questa pagina sopra i commenti. Ti consigliamo di leggere attentamente le regole prima di fare trading, poiché specificano le condizioni precise, i casi limite e le fonti che regolano come viene risolto questo mercato.